Galvanized razor Barb-wire successfully installed... Date: 28/05/2025 Address: Queens park phase2, orile imo, sagam-abeokuta road, Ogun state. Client: Mr. Muhammad Ibrahim Work duration: 1day
|
![]() |
Stage of work as at today 17/05/2025... Abolarin91:
|
![]() |
Stage of work as at today 17/05/2025...
Abolarin91:
|
![]() |
Installation of electric fence-wire successfuly completed... Date: 16/05/2025 Address: 1 Glover road, ikoyi Lagos. Client: Lieutenant Ali, Cc; major Ogunrinde Work duration: 1day
|
![]() |
Installation of electric fence-wire successfuly completed... Date: 16/05/2025 Address: 1 Glover road, ikoyi Lagos. Client: Lieutenant Ali, Cc; major Ogunrinde Work duration: 1day
|
![]() |
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! : Abolarin91:
|
![]() |
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! ![]() Abolarin91:
|
![]() |
Installation completed...
Abolarin91:
|
![]() |
Installation completed...
Abolarin91:
|
![]() |
Another site inspection/inventory taken today ![]() Date: 12/05/2025 Address: Lekki, Lagos. Client: Carrilion; Cc: Amusa construction Proposed material: Anti-finger or finger mesh(for storage of materials on sute).
|
![]() |
Another site inspection/inventory taken today ![]() Date: 12/05/2025 Address: Lekki, Lagos. Client: Carrilion; Cc: Amusa construction Proposed material: Anti-finger or finger mesh(for storage of materials on sute).
|
![]() |
Not aluminumbeveragecan exactly...using of iron plate to form the shape of beveragcan, it going to be 4ft height(not the size of beverage can)...
anyilalaz: |
![]() |
Another installation of razor Barb-wire has commenced... Date: 12/05/2025 Address: Agric, ikorodu Lagos. Client: Engr. Kola Work duration: 1day
|
![]() |
Another installation of razor Barb-wire has commenced... Date: 12/05/2025 Address: Agric, ikorodu Lagos. Client: Engr. Kola Work duration: 1day
|
![]() |
Alright, thank you
isholapeter9: |
![]() |
Hi, pls explain further on "clearance page". Thanks in anticipation.
isholapeter9: 1 Like |
![]() |
Hi everyone, it been a long time... Pls, any idea of how this can be done? A shape of can drink with this dimension...
|
![]() |
Work in progress...
Abolarin91:
|
![]() |
Work in progress...
Abolarin91:
|
![]() |
Installation of finger mesh(with 2 rolling gate) in progress... Date: 10/05/2025 Address: Osapa-london, lekki, Lagos. Work duration: 2-3 days Client: Carilion, Cc: Amusa construction
|
![]() |
Installation of finger mesh(with 2 rolling gate) in progress... Date: 10/05/2025 Address: Osapa-london, lekki, Lagos. Work duration: 2-3 days Client: Carilion, Cc: Amusa construction
|
![]() |
Installation of electric fence-wire successfully completed... Date: 9/05/2025 Address:19 Abude Bakate street, Adiyewocoat, Sagam ogun state. Client: engr. Chinedu Work duration: 2days
|
![]() |
Installation of electric fence-wire successfully completed... Date: 9/05/2025 Address:19 Abude Bakate street, Adiyewocoat, Sagam ogun state. Client: engr. Chinedu Work duration: 2days
|
![]() |
Abolarin91:
|
![]() |
Finger mesh and electric fence-wire fully completed...
Abolarin91:
|
![]() |
Installation of finger mesh and electric fence-wire in progress... Address: ibeju-lekki, Lagos Date: 1/05/2025 Client: Mr. Ayuba Work duration: mesh(1day), electric fence-wire(after concrete gets dried)
|
![]() |
Installation of finger mesh and electric fence-wire in progress... Address: ibeju-lekki, Lagos Date: 1/05/2025 Client: Mr. Ayuba Work duration: mesh(1day), electric fence-wire(after concrete gets dried)
|
![]() |
Installation of razor Barb-wire... Date: 17/04/2025 Address: 4 Simisola street, off Ogunlana, surulere Lagos. Client: Mr. Hamed Olalekan Work duration: 1day
|