Abolarin91(m): 3:49pm On May 10
Installation of finger mesh(with 2 rolling gate) in progress...

Date: 10/05/2025
Address: Osapa-london, lekki, Lagos.
Work duration: 2-3 days
Client: Carilion, Cc: Amusa construction

Abolarin91(m): 9:57am On May 11
Work in progress...
Abolarin91:
Installation of finger mesh(with 2 rolling gate) in progress...

Date: 10/05/2025
Address: Osapa-london, lekki, Lagos.
Work duration: 2-3 days
Client: Carilion, Cc: Amusa construction

Abolarin91(m): 10:12am On May 12
Another installation of razor Barb-wire has commenced...

Date: 12/05/2025
Address: Agric, ikorodu Lagos.
Client: Engr. Kola
Work duration: 1day

Abolarin91(m): 2:05pm On May 12
Another site inspection/inventory taken today cool...

Date: 12/05/2025
Address: Lekki, Lagos.
Client: Carrilion; Cc: Amusa construction
Proposed material: Anti-finger or finger mesh(for storage of materials on sute).

Abolarin91(m): 4:36pm On May 12
Installation completed...
Abolarin91:
Another installation of razor Barb-wire has commenced...

Date: 12/05/2025
Address: Agric, ikorodu Lagos.
Client: Engr. Kola
Work duration: 1day

Abolarin91(m): 5:43pm On May 12
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! cry
Abolarin91:
Installation of finger mesh(with 2 rolling gate) in progress...

Date: 10/05/2025
Address: Osapa-london, lekki, Lagos.
Work duration: 2-3 days
Client: Carilion, Cc: Amusa construction

Abolarin91(m): 6:51pm On May 16
Installation of electric fence-wire successfuly completed...

Date: 16/05/2025
Address: 1 Glover road, ikoyi Lagos.
Client: Lieutenant Ali, Cc; major Ogunrinde
Work duration: 1day

Abolarin91(m): 12:01pm On May 17
Stage of work as at today 17/05/2025...
Abolarin91:
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! cry