Installation of electric fence-wire done and dusted...

Date: 15/03/2025
Address: 43 Ahmed Onibudo street, Vi Lagos.
Client: Mr. Charles
Work duration: 1day

Abolarin91(m): 6:20pm On Mar 19
Installation of pergola covering completed...

Date: 19/03/2025
Address: Banana Island, ikoyi
Client: Engr. Charles
Work duration: 1day

Abolarin91(m): 2:13pm On Mar 24
A grateful client cool
Abolarin91:
Installation of razor Barb-wire successfully delivered...

Date: 8/03/2025
Address: 25 Aina Falege street, Agility Estate, Mile12.
Client: mrs. Akinsola
Work duration: 1day

Abolarin91(m): 5:34pm On Mar 26
Site inspection/inventory...

Date: 26/03/2025
Address: Onishon, Lakowe area, ibeju-lekki Lagos
Propose work: finger mesh
Client: Mr. Yakub

Abolarin91(m): 5:41pm On Mar 26
Installation of razor Barb-wire in progress...

Date: 26/03/2025
Address: Sangotedo, Lagos
Client: Ultimate zone Ltd, Cc: Mr. Godwin
Work duration: 2-3days
Abolarin91(m): 3:47pm On Mar 28
Rounding up...
Abolarin91:
Installation of razor Barb-wire in progress...

Date: 26/03/2025
Address: Sangotedo, Lagos
Client: Ultimate zone Ltd, Cc: Mr. Godwin
Work duration: 2-3days

Abolarin91(m): 9:32am On Apr 04
9:29am
Materials delivered yesterday night(3/04/2025) and Installation has commenced today(4/04/2025)...watch out for the outcome. : cool
Abolarin91:
Site inspection/inventory...

Date: 26/03/2025
Address: Onishon, Lakowe area, ibeju-lekki Lagos
Propose work: finger mesh
Client: Mr. Yakub

Abolarin91(m): 9:03am On Apr 06
Work successfully completed today 6/04/2025
Abolarin91:
Site inspection/inventory...

Date: 26/03/2025
Address: Onishon, Lakowe area, ibeju-lekki Lagos
Propose work: finger mesh
Client: Mr. Yakub

Abolarin91(m): 3:20pm On Apr 06
Another installation of finger mesh for children playground...

Date: 6/04/2025
Address: Ikate lekki, lagos
Work duration: 1day
Client: Engr. Femi

Abolarin91(m): 6:38pm On Apr 08
Another installation of razor Barb-wire(double line) ongoing...

Date: 8/04/2025
Address: Lekki-epe express way, ibeju, Lagos.
Client: HFP paving stone, Cc: Mr. Justice
Work duration: 2-4days

Abolarin91(m): 7:53pm On Apr 13
100% work completed...
Abolarin91:
Another installation of razor Barb-wire(double line) ongoing...

Date: 8/04/2025
Address: Lekki-epe express way, ibeju, Lagos.
Client: HFP paving stone, Cc: Mr. Justice
Work duration: 2-4days

Abolarin91(m): 7:55pm On Apr 13
More views cool
Abolarin91:
100% work completed...

Abolarin91(m): 11:04am On Apr 14
Materials arrived on site and installation begin...

Date: 14/04/2025
Address: Ola Joseph street, ijegun Lagos.
Materials: razor Barb-wire and Y-angle
Client: Dr. Tonny
Work duration: 1day

Abolarin91(m): 4:00pm On Apr 14
Fence fully secured, 100% work completed...
Abolarin91:
Materials arrived on site and installation begin...

Date: 14/04/2025
Address: Ola Joseph street, ijegun Lagos.
Materials: razor Barb-wire and Y-angle
Client: Dr. Tonny
Work duration: 1day

Abolarin91(m): 6:11pm On Apr 15
Eletric fence-wire installed...

Date: 15/04/2025
Address: 8 General Ogomudia Street by Studio 24 bus stop, Lekki phase1.
Client: CEP Lekki Hub. Cc: Mr. Joseph
Work duration: 1day

Abolarin91(m): 2:44pm On Apr 17
Installation of razor Barb-wire...

Date: 17/04/2025
Address: 4 Simisola street, off Ogunlana, surulere Lagos.
Client: Mr. Hamed Olalekan
Work duration: 1day

Abolarin91(m): 11:15am On May 02
Installation of finger mesh and electric fence-wire in progress...

Address: ibeju-lekki, Lagos
Date: 1/05/2025
Client: Mr. Ayuba
Work duration: mesh(1day), electric fence-wire(after concrete gets dried)

Abolarin91(m): 5:38pm On May 07
Abolarin91:
Installation of finger mesh and electric fence-wire in progress...

Address: ibeju-lekki, Lagos
Date: 1/05/2025
Client: Mr. Ayuba
Work duration: mesh(1day), electric fence-wire(after concrete gets dried)

Abolarin91(m): 3:39pm On May 10
Installation of electric fence-wire successfully completed...
Date: 9/05/2025
Address:19 Abude Bakate street, Adiyewocoat, Sagam ogun state.
Client: engr. Chinedu
Work duration: 2days

Abolarin91(m): 3:50pm On May 10
Installation of finger mesh(with 2 rolling gate) in progress...

Date: 10/05/2025
Address: Osapa-london, lekki, Lagos.
Work duration: 2-3 days
Client: Carilion, Cc: Amusa construction

Abolarin91(m): 9:58am On May 11
Work in progress...
Abolarin91:
Installation of finger mesh(with 2 rolling gate) in progress...

Date: 10/05/2025
Address: Osapa-london, lekki, Lagos.
Work duration: 2-3 days
Client: Carilion, Cc: Amusa construction

Abolarin91(m): 10:12am On May 12
Another installation of razor Barb-wire has commenced...

Date: 12/05/2025
Address: Agric, ikorodu Lagos.
Client: Engr. Kola
Work duration: 1day

Abolarin91(m): 2:06pm On May 12
Another site inspection/inventory taken today cool...

Date: 12/05/2025
Address: Lekki, Lagos.
Client: Carrilion; Cc: Amusa construction
Proposed material: Anti-finger or finger mesh(for storage of materials on sute).

Abolarin91(m): 4:37pm On May 12
Installation completed...
Abolarin91:
Another installation of razor Barb-wire has commenced...

Date: 12/05/2025
Address: Agric, ikorodu Lagos.
Client: Engr. Kola
Work duration: 1day

Abolarin91(m): 5:44pm On May 12
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! :
Abolarin91:
Installation of finger mesh(with 2 rolling gate) in progress...

Date: 10/05/2025
Address: Osapa-london, lekki, Lagos.
Work duration: 2-3 days
Client: Carilion, Cc: Amusa construction

Abolarin91(m): 6:53pm On May 16
Installation of electric fence-wire successfuly completed...

Date: 16/05/2025
Address: 1 Glover road, ikoyi Lagos.
Client: Lieutenant Ali, Cc; major Ogunrinde
Work duration: 1day

Abolarin91(m): 12:02pm On May 17
Stage of work as at today 17/05/2025...
Abolarin91:
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! :

Abolarin91(m): 11:37pm On May 28
Galvanized razor Barb-wire successfully installed...

Date: 28/05/2025
Address: Queens park phase2, orile imo, sagam-abeokuta road, Ogun state.
Client: Mr. Muhammad Ibrahim
Work duration: 1day

Reply)

Man's House Gutted By Fire While Watching Man City V Chelsea Match In Uyo.Photos

(Go Up)

Sections: How To . 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland.