Prevent Burglar/thief/pilferer From Entering Your Home (27803 Views)
Abolarin91(m): 6:54pm On Mar 15 |
Installation of electric fence-wire done and dusted... Date: 15/03/2025 Address: 43 Ahmed Onibudo street, Vi Lagos. Client: Mr. Charles Work duration: 1day
|
Abolarin91(m): 6:20pm On Mar 19 |
Installation of pergola covering completed... Date: 19/03/2025 Address: Banana Island, ikoyi Client: Engr. Charles Work duration: 1day
|
Abolarin91(m): 2:13pm On Mar 24 |
A grateful client ![]() Abolarin91:
|
Abolarin91(m): 5:34pm On Mar 26 |
Site inspection/inventory... Date: 26/03/2025 Address: Onishon, Lakowe area, ibeju-lekki Lagos Propose work: finger mesh Client: Mr. Yakub
|
Abolarin91(m): 5:41pm On Mar 26 |
Installation of razor Barb-wire in progress... Date: 26/03/2025 Address: Sangotedo, Lagos Client: Ultimate zone Ltd, Cc: Mr. Godwin Work duration: 2-3days |
Abolarin91(m): 3:47pm On Mar 28 |
Rounding up...
Abolarin91:
|
Abolarin91(m): 9:32am On Apr 04 |
9:29am Materials delivered yesterday night(3/04/2025) and Installation has commenced today(4/04/2025)...watch out for the outcome. : cool Abolarin91:
|
Abolarin91(m): 9:03am On Apr 06 |
Work successfully completed today 6/04/2025
Abolarin91:
|
Abolarin91(m): 3:20pm On Apr 06 |
Another installation of finger mesh for children playground... Date: 6/04/2025 Address: Ikate lekki, lagos Work duration: 1day Client: Engr. Femi
|
Abolarin91(m): 6:38pm On Apr 08 |
Another installation of razor Barb-wire(double line) ongoing... Date: 8/04/2025 Address: Lekki-epe express way, ibeju, Lagos. Client: HFP paving stone, Cc: Mr. Justice Work duration: 2-4days
|
Abolarin91(m): 7:53pm On Apr 13 |
100% work completed...
Abolarin91:
|
Abolarin91(m): 7:55pm On Apr 13 |
More views ![]() Abolarin91:
|
Abolarin91(m): 11:04am On Apr 14 |
Materials arrived on site and installation begin... Date: 14/04/2025 Address: Ola Joseph street, ijegun Lagos. Materials: razor Barb-wire and Y-angle Client: Dr. Tonny Work duration: 1day
|
Abolarin91(m): 4:00pm On Apr 14 |
Fence fully secured, 100% work completed... Abolarin91:
|
Abolarin91(m): 6:11pm On Apr 15 |
Eletric fence-wire installed... Date: 15/04/2025 Address: 8 General Ogomudia Street by Studio 24 bus stop, Lekki phase1. Client: CEP Lekki Hub. Cc: Mr. Joseph Work duration: 1day
|
Abolarin91(m): 2:44pm On Apr 17 |
Installation of razor Barb-wire... Date: 17/04/2025 Address: 4 Simisola street, off Ogunlana, surulere Lagos. Client: Mr. Hamed Olalekan Work duration: 1day
|
Abolarin91(m): 11:15am On May 02 |
Installation of finger mesh and electric fence-wire in progress... Address: ibeju-lekki, Lagos Date: 1/05/2025 Client: Mr. Ayuba Work duration: mesh(1day), electric fence-wire(after concrete gets dried)
|
Abolarin91(m): 5:38pm On May 07 |
Abolarin91:
|
Abolarin91(m): 3:39pm On May 10 |
Installation of electric fence-wire successfully completed... Date: 9/05/2025 Address:19 Abude Bakate street, Adiyewocoat, Sagam ogun state. Client: engr. Chinedu Work duration: 2days
|
Abolarin91(m): 3:50pm On May 10 |
Installation of finger mesh(with 2 rolling gate) in progress... Date: 10/05/2025 Address: Osapa-london, lekki, Lagos. Work duration: 2-3 days Client: Carilion, Cc: Amusa construction
|
Abolarin91(m): 9:58am On May 11 |
Work in progress...
Abolarin91:
|
Abolarin91(m): 10:12am On May 12 |
Another installation of razor Barb-wire has commenced... Date: 12/05/2025 Address: Agric, ikorodu Lagos. Client: Engr. Kola Work duration: 1day
|
Abolarin91(m): 2:06pm On May 12 |
Another site inspection/inventory taken today ![]() Date: 12/05/2025 Address: Lekki, Lagos. Client: Carrilion; Cc: Amusa construction Proposed material: Anti-finger or finger mesh(for storage of materials on sute).
|
Abolarin91(m): 4:37pm On May 12 |
Installation completed...
Abolarin91:
|
Abolarin91(m): 5:44pm On May 12 |
Stage of work as at today(12/05/2025)...delayed are caused by site engineer and artisan! : Abolarin91:
|
Abolarin91(m): 6:53pm On May 16 |
Installation of electric fence-wire successfuly completed... Date: 16/05/2025 Address: 1 Glover road, ikoyi Lagos. Client: Lieutenant Ali, Cc; major Ogunrinde Work duration: 1day
|
Abolarin91(m): 12:02pm On May 17 |
Stage of work as at today 17/05/2025... Abolarin91:
|
Abolarin91(m): 11:37pm On May 28 |
Galvanized razor Barb-wire successfully installed... Date: 28/05/2025 Address: Queens park phase2, orile imo, sagam-abeokuta road, Ogun state. Client: Mr. Muhammad Ibrahim Work duration: 1day
|