OredoPikin: 9:06am On Jun 01
The commissioning of just 30km out of a 750km coastal highway to mark President Tinubu’s two years in office is baffling, and quite frankly, insulting to any citizen paying attention.

Let’s do the math:

Total Project Length: 750km

Completed: 30km

Remaining: 720km

That’s just 4% of the entire project completed in two years.

At this rate — 30km every two years — it would take 50 years to complete the full road. Fifty. Years.
Is that how low the bar has dropped?

This isn't just laughable, it's a stark reflection of how unserious leadership can be when it comes to infrastructure delivery. In any country where citizens demand ability, such a move would spark calls for resignations, not celebrations.

Nigerians deserve real progress, not ceremonial ribbon-cutting of unfinished promises. This level of performance isn't just underwhelming, it’s a blatant disregard for the expectations of the people.

14 Likes 1 Share

Tjra: 9:09am On Jun 01
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.

3 Likes 1 Share

OredoPikin: 9:12am On Jun 01
Tjra:
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.
Then why rushing to commission 30km?

12 Likes

Zionmdde: 9:13am On Jun 01
Tjra:
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.
Sorry to ask but have you written jamb?
because you sound like someone who just wrote waec

11 Likes

Tjra: 9:19am On Jun 01
Zionmdde:

Sorry to ask but have you written jamb?
because you sound like someone who just wrote waec
If you have critical thinking skills, you will know that projects of this magnitude requires huge funding.

With funding in place, what should take 30 years can be done in a year.

2 Likes

Zionmdde: 11:20am On Jun 01
Tjra:

If you have critical thinking skills, you will know that projects of this magnitude requires huge funding.

With funding in place, what should take 30 years can be done in a year.
Answer me first, have you written Jamb?

Then if 2 years can fund 30km, how many years can fund 720km?
Use it as a revision, you might see such question in Jamb

11 Likes

Jieta2: 11:45am On Jun 01
Tjra:
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.
Whenever you wake up in the morning never forget to ask God for wisdom.

10 Likes

Tinubuadvocate: 11:54am On Jun 01
The company handling the project are not really effectively in delivering projects at schedule time lekki Epe-Express way is a good example.

And this kind projects should distribute to different company shouldn't be singlehadedly by one company.
Tjra:
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.

1 Like

Walai(m): 11:58am On Jun 01
30km out of 750km in two years celebrated with funfare by a whole Presidency.
The called it phase 1, the question is how many phases is the project?

7 Likes 1 Share

Typing: 12:13pm On Jun 01
OredoPikin:

Then why rushing to commission 30km?

Tinubu is older version of yahoo Boy. In other words, Tinibu is a YAHOO MAN. He don scam us for this Country

1 Share

Typing: 12:14pm On Jun 01
Zionmdde:

Sorry to ask but have you written jamb?
because you sound like someone who just wrote waec

Tinubu is older version of yahoo Boy. In other words, Tinibu is a YAHOO MAN. He don scam us for this Country

AMINDA: 12:22pm On Jun 01
The man is only making his personal real estate, Eko Atlantic City more viable using our commonwealth. So dark the con of man!

Just look at the level of sycophancy and low self-esteem! The initiator and actualizer indeed. The emperor is walking stark naked with no clothes on but he has nobody to tell him.

1 Like

Emu4life(m): 12:25pm On Jun 01
It's a White Elephant Job meant to reward the Chagourys for sponsoring Tinubu's Presidential ambitions.
Who spends 15Trn on a road to nowhere when you don't have a Functional Steel Industry (The Bedrock of Industrialization)?

It's a potential 'Abandoned Project' that no subsequent Government will ever want to complete.

Tinubu don scam everybodygrin

7 Likes 1 Share

WizardOfNG: 12:37pm On Jun 01
Tjra:
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.

Bro you are arguing with hardcore haters. You cannot win with those type.

To begin with, and including the OP as a core culprit, these haters stole almost an entire year on the construction timeline of the Lagos Calabar coastal highway simply to malign the Tinubu Presidency.

They are claiming 30km delivered in two years before the world. Yet see below to note construction began officially in March 2024. They stole an entire 10 months on construction timeline.

You need nothing else than that to note you are dealing with those ready to use lies and deception to dupe others that their pre-concieved condemnation of everything Tinubu does is valid.

3 Likes 1 Share

mikael11(m): 1:00pm On Jun 01
WizardOfNG:


Bro you are arguing with hardcore haters. You cannot win with those type.

To begin with, and including the OP as a core culprit, these haters stole almost an entire year on the construction timeline of the Lagos Calabar coastal highway simply to malign the Tinubu Presidency.

They are claiming 30km delivered in two years before the world. Yet see below to note construction began officially in March 2024. They stolen an entire 10 months on construction timeline.

You need nothing else than that to note you are dealing with those ready to use lies and deception to dupe others that their pre-concieved condemnation of everything Tinubu does is valid.
Okay so if they use 1y to complete 30km that's still 25y to complete it why waste fund in such projects when other important sector needs it

4 Likes

WizardOfNG: 1:07pm On Jun 01
mikael11:

Okay so if they use 1y to complete 30km that's still 25y to complete it why waste fund in such projects when other important sector needs it

As Tjra explained to you lot, with many feigning ignorance of his point, funding the project, for many reasons that I do not have the interest nor time to explain, will become significantly easier.

Meaning the entire road could possibly be finished by Tinubu's second term in 2031 that I am assuming he will complete.

3 Likes 1 Share

dollypi(m): 1:22pm On Jun 01
WizardOfNG:


As Tjra explained to you lot, with many feigning ignorance of his point, funding the project, for many reasons that I do not have the interest nor time to explain, will become significantly easier.

Meaning the entire road could possibly be finished by Tinubu's second term in 2031 that I am assuming he will complete.

dollypi(m): 1:24pm On Jun 01
We will revisit this alive and in good health by 2027.

By the special grace of God.


[quote author=dollypi post=135587852][/quote]

1 Like

ionnn: 1:30pm On Jun 01
OredoPikin:

Then why rushing to commission 30km?
Except he rigs himself back to power in 2027, thus baboon is packing out of Aso Rock in 2027,
That aside, who told you that the problem was finding?

2 Likes

Ikaeniyan0: 1:48pm On Jun 01
OredoPikin:
The commissioning of just 30km out of a 750km coastal highway to mark President Tinubu’s two years in office is baffling, and quite frankly, insulting to any citizen paying attention.

Let’s do the math:

Total Project Length: 750km

Completed: 30km

Remaining: 720km

That’s just 4% of the entire project completed in two years.

At this rate — 30km every two years — it would take 50 years to complete the full road. Fifty. Years.
Is that how low the bar has dropped?

This isn't just laughable, it's a stark reflection of how unserious leadership can be when it comes to infrastructure delivery. In any country where citizens demand ability, such a move would spark calls for resignations, not celebrations.

Nigerians deserve real progress, not ceremonial ribbon-cutting of unfinished promises. This level of performance isn't just underwhelming, it’s a blatant disregard for the expectations of the people.
The project is not yet up to 2 years. Sand filling in section 2 of the project is more than 60% done, the Lagos section will be completed this year. Work on the project is going at a fast pace. It's a very massive project.

Work is ongoing in Cross River and Akwa Ibom too and work will be completed there by the end of next year.

2 Likes

stonemasonn: 2:08pm On Jun 01
It'll be nice to also bring on board Julius berger and may be RCC.

1 Like 1 Share

ZACHIE: 2:30pm On Jun 01
This is a pedestrian way to analyse the project.
You are entitled to your opinion sha

1 Like

helinues: 2:53pm On Jun 01
When the 30km road Is ready, don't ply it.

Save us unnecessary headache

2 Likes

KillahPriest: 2:54pm On Jun 01
Tjra:
Once the funding constraints are taken care of, the project will be completed before he leaves office in 2031.
OPUEH grin

2 Likes

Stolen: 3:01pm On Jun 01
LOL


IF U BELIEVE THAT 30KM IS DONE, THEN U NEED DELIVERANCE MINISTERY FROM TINUBU LIES.




NOT EVEN 5KM HAVE BEEN COMPLETED AND MOTORABLE FROMN LAGOS TO CALABAR.



WHEN PEOPLE WANT TO LOOT THEY LOOK FOR A PROJECT TO HIDE WHAT THEY ARE REMOVING.
Stolen: 3:01pm On Jun 01
USUALLY A SENSELESS PROJECT.

1 Like

Agbegbaorogboye: 3:33pm On Jun 01
It's just self-adulation to impress his band of worshippers.
He knows those ones will hail and excuse anything as long as he's the one doing it
Just imagine it was a Jonathan or OBJ that commissioned an uncompleted project
You know the kind of invectives and hateful words that will be coming out from them by now?

1 Like

Biodun556(m): 3:36pm On Jun 01
OredoPikin:
The commissioning of just 30km out of a 750km coastal highway to mark President Tinubu’s two years in office is baffling, and quite frankly, insulting to any citizen paying attention.

Let’s do the math:

Total Project Length: 750km

Completed: 30km

Remaining: 720km

That’s just 4% of the entire project completed in two years.

At this rate — 30km every two years — it would take 50 years to complete the full road. Fifty. Years.
Is that how low the bar has dropped?

This isn't just laughable, it's a stark reflection of how unserious leadership can be when it comes to infrastructure delivery. In any country where citizens demand ability, such a move would spark calls for resignations, not celebrations.

Nigerians deserve real progress, not ceremonial ribbon-cutting of unfinished promises. This level of performance isn't just underwhelming, it’s a blatant disregard for the expectations of the people.

Funding is the key
michlins(m): 3:43pm On Jun 01
WizardOfNG:


As Tjra explained to you lot, with many feigning ignorance of his point, funding the project, for many reasons that I do not have the interest nor time to explain, will become significantly easier.

Meaning the entire road could possibly be finished by Tinubu's second term in 2031 that I am assuming he will complete.

you keep mentioning funds, was the issue of funding not considered before awarding a contract of such magnitude? Opposition hammered on the funding aspect and how the government can't afford such expensive venture but the same government and you lots regaled us on how tinubu is a financial wizard and will pluck funds from the thin air


So why use it as excuse again

1 Like 1 Share

highchief1: 3:52pm On Jun 01
Tjra:

If you have critical thinking skills, you will know that projects of this magnitude requires huge funding.

With funding in place, what should take 30 years can be done in a year.
so u will go and dig foundation for a 6 bedroom duplex when u are a private school teacher?what do u mean by funding?Funding is projecting.only a mad person starts what they can’t finish.

3 Likes