NewStats: 3,264,172 , 8,182,863 topics. Date: Tuesday, 10 June 2025 at 02:16 AM 6m6k3x

6382y

General Topic Thread-To Discuss Anything And Everything in Building Construction - Properties (3689) - Nairaland 4n2zg

General Topic Thread-To Discuss Anything And Everything in Building Construction (5394440 Views)

(4)

Go Down)

BrickDevo: 12:16pm On Jun 05, 2024
When will sujimoto finish this building? I wonder what is taking him so long to complete it, since 2020

SaintUlot: 12:33pm On Jun 05, 2024
SaintUlot:
FOR SALE

1. This 12v pure sine wave inverter has the capacity to power 4 freezers @ the same time.

Capacity: 6000w Surge capacity and 2750w Actual capacity

Dc to Ac conversion efficiency : 90 - 95%
Idle consumption : 0.3 amp

It is a Non-grid tied Inverter. It powers Inductive and non-inductive loads seamlessly.

In the test video below, I used it to power all these appliances @ the same time:

👉 One normal freezer
👉 1hp pumping machine
👉charge spare battery
👉 one 32inch TV with Decoder
👉 2 medium sized fans
👉1 big ox fan

Then I switched off only the pumping machine to plug in the 1200w pressing iron


I have just one left, If you are interested in buying it, call or WhatsApp 08035537864



https://www.youtube.com/watch?v=0Rap3bnI07g

2. 12v 30A Smart Battery charger with digital display

It can be used to charge any type of Battery and it does not overcharge batteries, it is a smart battery charger, it adjusts itself to the amount of charge battery needs and stops charging once battery is full.

ed below is the Smart charger picture.
Call or WhatsApp 08035537864 if you need it.

Still available
Philipok: 12:50pm On Jun 05, 2024
me for ur artwork design,08165523784.

Smartdoy(m): 2:04pm On Jun 05, 2024
Please I have a question.

Which is the most appropriate? Roofing before Gale bridge or Gale bridge before roofing
michlins(m): 3:04pm On Jun 05, 2024
BrickDevo:
When will sujimoto finish this building? I wonder what is taking him so long to complete it, since 2020
same thing holding numerous projects in Nigeria. Investors and funding
RockOfAgesAlumi(m): 3:07pm On Jun 05, 2024
Smartdoy:
Please I have a question.

Which is the most appropriate? Roofing before Gale bridge or Gale bridge before roofing
Roofing before gable-end
Thanks
bolu1986(m): 4:14pm On Jun 05, 2024
Let’s do yours


Pop & wall screeding

07088534661

3 Likes 2 Shares

RockOfAgesAlumi(m): 4:39pm On Jun 05, 2024
bolu1986:
Let’s go yours


Pop & wall screeding

07088534661
Wow well done sir
Thanks
folmus: 4:48pm On Jun 05, 2024
CELEBRITYSAND:





Sharp sand and stonedust 15 tons to Poka, Epe = 👇

Sharpsand 90k stone dust 110k
Thanks.
Note. Payment upon delivery to site 🙏

Response came late.
Had them delivered this morning.

I will keep you handy for subsequent need.
No any estate fee or wahala to the site.

1 Like

rotecch77(m): 7:03pm On Jun 05, 2024
Still on this “ Royal Hall
Imported railings

Turkish monarch ceiling design to be added to the pop ceiling

1 Like

Thazard(m): 8:14pm On Jun 05, 2024
Hello Michlins

Please how much is this design sold in Onitsha.

Both the big one and the small one.

michlins(m): 8:38pm On Jun 05, 2024
Thazard:
Hello Michlins

Please how much is this design sold in Onitsha.

Both the big one and the small one.
you mean only the snail or total charge for the construction per meter

Modified as I didn't get a clear response from you, here's the price of both items.

The snail is 25 and 28k for small or big size. Cost of making it per meter is 55,000
Dennis3D(m): 5:39am On Jun 06, 2024
Noworries11:
My country people and elders in the building
Na my first time to build.... I kept bringing out money so tey i spent way above my budget just to get to lintel phase however please I need an advise for an estimate cost for the decking for a semi detached duplex (4 bedroom each duplex I.e 8 bedroom semi-detached duplex)

The site engr has estimated about #4,226,000 just for the rods (decking) while another engr on the side who is willing to handle has estimated #1,050,000

Brethren to say I am confused is an understatement

I decided to run here and perhaps get professional advice.
Please note that this is the cost for rod alone

Let me break it further how they arrived at the said amount

Site Engr;
70 lengths of 16mm rod @17,000 =#1,190,000
300 lengths of 12mm rod @9,400 =#2,820,000
50 lengths of 8mm rod-@3400 =#170,000
Binding wire = #45000
Total = #4,225,000

*Alternate Engr*

2) *ROD 16M² 25PIECES PER 1? N14,500× 25 = N350,000*

3) *ROD 12M² 60 PIECES PER 1? N9,200 × 60 = N552,000*

4) *ROD 8M² 30 PIECESB PER 1? N4,500 × 30 = N135,000*

6) *BANDING WIRE #20,000*

Total = N1,057,000

Please make una choke mouth for the matter

Share the decking structural plan for advise. But going by practice, there is no way the second guy knows what he is doing. A 4 Bedroom Duplex which I belive has three rooms upstairs, the first person is close to what it is. You are dealing with decking, those 16mm bars are needed, the 12mm for slab and staircase and 8mm or 10mm for rings and runners where necessary. Even, a room of 12sqm standard can take as much as 40 - 60pcs of 10mm by Cross section top and bottom bars alone. Talk more of the complete decking area. Sobe staircase alone can take as much as 30 - 40 lengths of 12mm depending on their size, design and reinforcement details.

What exactly did the second person wake up from to get that quote.

Side note: Too cheap doesn't always make it right pls. This second quote I can guarantee you 100% doesn't know what he is writing
mexxy1(m): 6:17am On Jun 06, 2024
Philipok:
me for ur artwork design,08165523784.

I seriously doubt you did these else you won't deliberately cut out the phone number of the 'Art man' in the second picture while trying to 'your job'.

1 Like

Godisgreatest1: 7:35am On Jun 06, 2024
mexxy1:


I seriously doubt you did these else you won't deliberately cut out the phone number of the 'Art man' in the second picture while trying to 'your job'.

twinskenny(m): 7:47am On Jun 06, 2024
mexxy1:


I seriously doubt you did these else you won't deliberately cut out the phone number of the 'Art man' in the second picture while trying to 'your job'.
He didn’t say he did it though
dannie007(m): 8:55am On Jun 06, 2024
for Security Doors and Internal Doors.

09090040008, 08066377733.
Whatsapp or Call

OX Multiservices

bolu1986(m): 10:03am On Jun 06, 2024
Do you use anchor bolt for under the deck pop or just nail? We are re doing the pop in this place due to collapse!!

Note anchor bolt is necessary


Let’s talk 07088534661

1 Share

Adedward(m): 12:11pm On Jun 06, 2024
Good afternoon here, our Ibadan transum windows with nets is going for installation, us today for ur estimate about ur windows, thanks

oracle009(m): 12:56pm On Jun 06, 2024
My people... I am here again o. My head is just doing gbas gbos at the moment. The estimates my contractor gave me (less than 1 month again) is about 1m+ off for each activities. Very unreliable estimates. These have greatly affected my planning.

Please I need a quote for roofing 270sqm. I need to know the roofing options that I have (cheap, cheaper, cheapest cheesy). I have attached the former quote my contractor gave me (white) and the house plan.

Note: the roof dimension na 270sqm.

I also need quote from someone who make bulglary, aluminum windows, iron door and american s.

I also need for POP also. I want to start taking actions myself currently because they don almost make me craze embarassed grin

I am willing to contract reliable people here if we have a good deal compared to what's on ground. The project is in Abeokuta, so let's also think about proximity to service center. I am opened to DM after confirming your service from gurus here.
E se o. We no go get hypertension o grin

1 Like

Deeegbee: 1:02pm On Jun 06, 2024
dannie007:
for Security Doors and Internal Doors.

09090040008, 08066377733.
Whatsapp or Call

OX Multiservices

How much is the 1st door in the picture?
Orangedreams: 1:18pm On Jun 06, 2024
Opp. *TINCAN ISLAND APAPA*

Industrial 5 ACRES OF
LAND with C of O
N2 billion.

For sale @ *ORSBOURN PHASE 1 ESTATE* *2000m²* bareland fenced with Fed C of O ₦2.3bn. negotiable

*INDUSTRIAL* WAREHOUSE FOR
*SALE.@*
*AJAO ESTATE*
Vacant 2 bay warehouse of *3,300m2* space on
*4,400m2* Land
c of o. N1.7bn
michlins(m): 2:06pm On Jun 06, 2024
oracle009:
My people... I am here again o. My head is just doing gbas gbos at the moment. The estimates my contractor gave me (less than 1 month again) is about 1m+ off for each activities. Very unreliable estimates. These have greatly affected my planning.

Please I need a quote for roofing 270sqm. I need to know the roofing options that I have (cheap, cheaper, cheapest cheesy). I have attached the former quote my contractor gave me (white) and the house plan.

Note: the roof dimension na 270sqm.

I also need quote from someone who make bulglary, aluminum windows, iron door and american s.

I also need for POP also. I want to start taking actions myself currently because they don almost make me craze embarassed grin

I am willing to contract reliable people here if we have a good deal compared to what's on ground. The project is in Abeokuta, so let's also think about proximity to service center. I am opened to DM after confirming your service from gurus here.
E se o. We no go get hypertension o grin
come for your metal doors, handrail plus window burglaries and tank stand. Offered such services for many people here and the building below is one of such projects I have handled here

oracle009(m): 2:22pm On Jun 06, 2024
michlins:
come for your metal doors, handrail plus window burglaries and tank stand. Offered such services for many people here and the building below is one of such projects I have handled here

I will call you
bolu1986(m): 2:55pm On Jun 06, 2024
oracle009:
My people... I am here again o. My head is just doing gbas gbos at the moment. The estimates my contractor gave me (less than 1 month again) is about 1m+ off for each activities. Very unreliable estimates. These have greatly affected my planning.

Please I need a quote for roofing 270sqm. I need to know the roofing options that I have (cheap, cheaper, cheapest cheesy). I have attached the former quote my contractor gave me (white) and the house plan.

Note: the roof dimension na 270sqm.

I also need quote from someone who make bulglary, aluminum windows, iron door and american s.

I also need for POP also. I want to start taking actions myself currently because they don almost make me craze embarassed grin

I am willing to contract reliable people here if we have a good deal compared to what's on ground. The project is in Abeokuta, so let's also think about proximity to service center. I am opened to DM after confirming your service from gurus here.
E se o. We no go get hypertension o grin
for pop let’s talk we give you friendly price

07088534661 WhatsApp

1 Like 1 Share

ChybuzzDD(m): 2:56pm On Jun 06, 2024
oracle009:

E se o. We no go get hypertension o grin

grin Not avoidable under the current economy and when dealing with majority of Nigerian workers/artisans.
michlins(m): 3:28pm On Jun 06, 2024
oracle009:


I will call you
ok sir. 07032fourfour6904

1 Like

Aduragbemi45(m): 10:02pm On Jun 06, 2024
oracle009:
My people... I am here again o. My head is just doing gbas gbos at the moment. The estimates my contractor gave me (less than 1 month again) is about 1m+ off for each activities. Very unreliable estimates. These have greatly affected my planning.

Please I need a quote for roofing 270sqm. I need to know the roofing options that I have (cheap, cheaper, cheapest cheesy). I have attached the former quote my contractor gave me (white) and the house plan.

Note: the roof dimension na 270sqm.

I also need quote from someone who make bulglary, aluminum windows, iron door and american s.

I also need for POP also. I want to start taking actions myself currently because they don almost make me craze embarassed grin

I am willing to contract reliable people here if we have a good deal compared to what's on ground. The project is in Abeokuta, so let's also think about proximity to service center. I am opened to DM after confirming your service from gurus here.
E se o. We no go get hypertension o grin

You can us for white ceiling pop and cement artworks.

08084563296

1 Like

Gharnew112(m): 11:36pm On Jun 06, 2024
Granite 15 tons
Sharpsand 30 tons
To Abule Egba, Lagos?

@CELEBRITYSAND

1 Like

akenzua74(m): 3:23am On Jun 07, 2024
alphabbey1:
I need someone to please criticize this quote given by an engineer...

Estimation For Decking

IRON- y16. 75length @ 18,000
Y12.400 length @ 10000=
Y10.98. Lengths@6500
Labour 200,000
Transport 30,000
Total = 4,825,000

Woods
1 by 6 200pic@800 =160,000
1 by 9 50pic @1600= 80,000
2 by 3 300pic @ 600= 180,000
1 by 12 420pic @ 1800=756,000
3inch Nail 2 bags 45,000
2inch Nail 2 bags 40,000
4inch Nail 1 bag. 22,000
Binding wire 20kg 32,000
Bamboo 400pic @1200=480,000
Workmanship 250,000
Total =2,045,000

MATERIALS FOR CASTING
2 HOWO 200,000
Gravel 40tons@6500=260,000
Transport 70,000
Dust 30ton 6500= 174,000
Transport 55,000
Filling 30,000
Casting 300,000
Water 50,000
Vibrator Available
Curing 5days 5000
Total 3,080,000

Electrical
8pack of 20mm pipe @ 12,000=96,000
5 pack of 25mm pipe @ 16,000= 80,000
4pkt’s 20mm cop 3000=12,000
2pkt of 20mm cop small@1900=3800
4pkt of 25mm cop 2000=8,000
1 pvc gum big one =4000
Workmanships. =. 60,000
Total 263,800

Plumbing
4” pipe 6pic @ 4500=27,000
4” elbow 10pic @1000= 10,000
2” pipe 15pic. 2500=37,500
2”elbow 15pic. 500=7,500
2” tee 10pic. @ 500=5000
4” tee 10pic@ 1000= 10,000
4by2 tee. 8pic@1200= 9600
Abro gum. =9000
PPR pipe 5pic 2000=10,000
Workmanships = 50,000
Total 175,600

Total = 10,393,600



The stages of the work is below and stage 4 is about to start

Stages of the work
*FOUNDATION LEVEL
*BLOCK WORK AFTER DPC BEFORE THE LINTEL
*LINTEL AND LEVELING BEFORE DECKING
*DECKING, SLABING BEFORE THE FIRST FLOOR
*FIRST FLOOR, BLOCK WORK
*LINTEL AND LEVELING
*PARAPET AND ROOFING
you can save 30% of this when you go for beams and blocks technology

1 Like

dannie007(m): 5:02am On Jun 07, 2024
170k Sir Full HDF Door installation and Good quality Key locks




Deeegbee:


How much is the 1st door in the picture?
Deeegbee: 6:31am On Jun 07, 2024
dannie007:
170k Sir Full HDF Door installation and Good quality Key locks





I got your number from your page; I hope it is negotiable?

Reply)

Viewing this topic: 1 guest(s)

(Go Up)

Sections: How To . 49
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland.