NewStats: 3,263,658 , 8,180,921 topics. Date: Saturday, 07 June 2025 at 06:30 AM u2s1e

6382y

Aforxzy's Posts 11h6b

Aforxzy's Posts

(1) (10) (of 37 pages)

Aforxzy(f): 9:42pm On May 22
Your soakaway can be designed and built in such a way that it can vehicular load conveniently without failing.



dapotemi:
Pls I'll appreciate your input here.
I have gotten to the soakaway stage in my bungalow. I have very limited space. It's half plot (100 by 25), and I was able to squeeze a two bedroom flat and two mini flat on it as a single unit.
The problem now is, the only space remaining in front is where d soakaway will be and aside from the conventional soakaway, which other option do I have.. I won't consider Biodigester because this is a rental property. Tenant hardly follow rules. The remaining space can manage two small car. The car will be parked ON d soakaway always and this bothers me. My dad's soakaway just went down on its own last year after 9 years and car is not even allow on it.
Someone is advising I consider the ring soakaway due to space. Is there any disadvantage to this ring's own..My land is not very hard, tho not swampy..its just in d middle. What other options do I have? Appreciate any response
Aforxzy(f): 6:05pm On May 04
Project picture

Aforxzy(f): 6:03pm On May 04
Pic

Aforxzy(f): 5:58pm On May 04
More warehouse picture
Aforxzy(f): 5:50pm On May 04
Happy Sunday everyone

3 Likes

Aforxzy(f): 11:05am On Oct 16, 2024
Casting of column bases

Aforxzy(f): 10:45am On Oct 16, 2024
It is a cantilever beam or slab?
The depth, the position and size of the rebars of the structural member must be adequate enough to the expected load.

Pclemenza:
Good morning, please for someone overseeing the construction of a cantilever of 2.3m, what useful information should I have in mind to get the best result.

3 Likes

Aforxzy(f): 5:04pm On Aug 22, 2024
Placement of column starters rebars

Aforxzy(f): 4:55pm On Aug 22, 2024
It is possible to have such design without any fear of collapse, if it is properly designed by a structural engineer and also constructed as designed cos the weight of the roof : trusses and covering would have been taken into consideration during the design stage.

For such cantilever beams, the size and position/placement of the reinforcement bar is very important in order to adequately the load it would be subjected to without any deflection or failure.

If your engineer has done the right thing then there is nothing to be worried about.

Celepope:
Hello guys.
I am about to do the roofing in this house but I’m scared if the front won’t collapse after sometime owing to the fact that there is no ing pillars and with the weight of the wood work and the Gerald roof resting on it. He assured me he used enough 16mm rods with good reinforcement. What do you guys think?

1 Like

Aforxzy(f): 7:01am On Aug 16, 2024
Good morning all.
Enjoy your day
Aforxzy(f): 12:37pm On Aug 14, 2024
Blinding of column bases

Aforxzy(f): 3:01pm On Aug 08, 2024
The foundation types are pad and strip footings

Excavation of trenches

Aforxzy(f): 11:47am On Aug 06, 2024
Setting out of building

Aforxzy(f): 5:59pm On Aug 03, 2024
Site clearing

Aforxzy(f): 6:36pm On Aug 02, 2024
An experienced/qualified safety officer is urgently needed at a construction site in

Ogun state.

Send your application to [email protected]
Aforxzy(f): 1:54pm On Aug 01, 2024
We are constructing an electrical control room ..

us as we share the construction process..
Aforxzy(f): 1:47pm On Aug 01, 2024
Happy new month everyone.
This month of August shall favour us and there shall be no lost.

1 Like

Aforxzy(f): 1:41pm On Aug 01, 2024
An experienced/qualified safety officer is urgently needed at a construction site in

Ogun state.

Send your application to [email protected]
Aforxzy(f): 4:28pm On Jun 08, 2024
Sad. They should do an autopsy to determine the actual cause of her death.

11 Likes 1 Share

Aforxzy(f): 3:14pm On Jun 02, 2024
Happy new month everyone

Aforxzy(f): 3:11pm On Jun 02, 2024
Happy new month everyone

Aforxzy(f): 9:21am On Jun 02, 2024
Wonder working power

2 Likes

Aforxzy(f): 6:58pm On May 31, 2024
We are only responsible for the civil works not fabrication of tanks

michlins:
what's the gauge of metal sheet you're using. Nothing less than 12mm right?
Aforxzy(f): 2:06pm On May 31, 2024
Yes.
michlins:
for oil storage?
Aforxzy(f): 6:47pm On May 30, 2024
Circular above ground tanks.



michlins:
what type of tank is supposed to be situated here

Aforxzy(f): 3:55pm On May 30, 2024
Ring beams for large storage tanks

3 Likes

Aforxzy(f): 6:05pm On Apr 28, 2024
I do not additional floor(s) during construction stage without structural redesign and checks to confirm the suitability of the .
However since this floor is to the solar s only , you don’t need 20mm bars for the columns, instead use 16mm as your second to roof level columns reinforcements and also ensure that you stiffen the s with reinforced concrete beams.

Let your structural engineer design the roof slab and beam, the thickness of your slab should be at least 150mm (6inches) or as designed by the engineer.



Chichilas:
Good afternoon everyone.

I would like to seek opinions from esteemed and building experts here.

I am currently building a 2 storey(3 floor) house with about 40 pillars: The structural design stated 16mm rods for pillar reinforcement and we are adhering to it.

However, I have decided to change the roof design from an aluminum roof to a concrete slab(deck) roof for asthetics purposes and most importantly because I want to fill the entire roof with solar s and we want to be able to move around it easily and clean them regularly.


Now my question is, do I need to add extra reinforcements for the structure to be able to take the roof slab? My structural engineer says a 4 inch roof slab will suffice and I do not need to add extra reinforcements. I am wondering if we should have just used 20mm rods for the pillars from the beginning.

Does anyone have an idea if the 16mm pillars will suffice to carry the additional load?

I appreciate and anticipate all responses.

1 Like

Aforxzy(f): 5:11pm On Apr 27, 2024
Ring beams construction for above ground large storage tank

Aforxzy(f): 5:08pm On Apr 27, 2024
This concrete wall has failed, i suggest you break it off and do a new one well reinforced, with adequate thickness and good mix ratio.






speak2bella:
Hello people, please I need your honest advice on how to remedy this sockaway project. The person is trying to build a precast sockaway because the soil is sandy. However, while trying to dig the ground so the precast sinks down, it cracked and why trying to figure that out, the side starts to compress.

I will be in the comment section to read your honest advice. Many thanks great minds.

2 Likes

Aforxzy(f): 4:37pm On Apr 27, 2024
Do a soil test to confirm the nature of your subsoil and also know the appropriate foundation type. However, the final height of your foundation should be determined by the road level to avoid flood of your

TeetoBolt:
Guys I need your help, my engineer is telling me that my foundation will be this tall due to swampy area, I am scared of the amount I will spend, any suggestions please
Aforxzy(f): 6:04pm On Apr 22, 2024
When it's your time to shine, nothing can stop it. Enjoy madam..God gat you.

7 Likes 2 Shares

Aforxzy(f): 8:27pm On Apr 15, 2024
The pastor spoke too fast..

8 Likes 3 Shares

(1) (10) (of 37 pages)

(Go Up)

Sections: How To . 25
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or s on Nairaland.